Working in Gallissà pools
During these days we keep working on the actions of Life Alnus project in Gallissà pools. These actions have been made until now:
- The hillock has been removed and the land for the plantation has been prepared.
- The piping that goes to the first pool has been installed. This will allow the Segre’s water to come in. It is planned to plant in the areas where the land is shaked in order to naturalize and stabilize the slopes.
- A footbridge has been built beyond the open section that is going to connect the fisrt pool and the second.
- Alder trees, willows and ash trees have been planted to help in the consolidation of the riverbank forest that existed in this area in the past.